Products

Pile cages

Description

Our welding department at the Dormagen branch, which has been in existence since 1991, has been constantly upgraded and expanded so that we can produce an average of 1,400 t of round pile cages per month. Our storage area of 15,000m² also allows us to handle large projects with ease. Deliveries are made using our own trucks, up to 24m in length as well as with self-loading crane vehicles.

Built-in parts and specialties

In the production of bored pile cages, we can produce special cage types and install special built-in parts This includes:

  • SOB cages (tapers below)
  • 2. Location
  • Cage in cage
  • Curved uprights
  • Lenton or Hy-Ten couplers
  • GRP mesh (glass fibre reinforced plastic reinforcement)
  • Vibrating blades
  • Tubular
  • Cladding tubes
  • Bearer
  • Inclinometer tubes
  • Earthing strap
  • Injection tubes and grouting pads
  • Bullflex hoses
  • Recépieux
  • and a lot more

Delivery programme

The reinforcement cages made of B500B welded to DIN-EN-ISO17660 are produced on one of nine pile cage machines, this means that we can produce the following cage parameters for you with different production methods:

Outside cage diameter: min. 12cm - max. 162cm

  • Longitudinal reinforcement:
    • Complete cages
      - < Ø16mm long bars up to 15.00m
      - Ø 16mm - 40 mm long bars up to 18.00m
      - In addition, with factory joints
  • Spiral reinforcement:
    • Spiral rod Ø 6mm - 16mm
    • Different gradients and spiral rod diameter possible in one cage
  • Inner helix
    • Inner helixes are possible up to a length of 16.00m
    • The spiral rod diameters here are between 8mm and 10mm
  • Foot plates for pile reinforcement
    • Waterproof welded foot plate

References

GERMANY

  • Arge, Porr AG Rhine bridge Leverkusen:
    327 t / 151 pcs.
  • Demler Spezialtiefbau GmbH & Co. KG, Hochmoseltal bridge Ürzig:
    743 t / 206 pcs.
  • Implenia Spezialtiefbau GmbH, building pit home port, Dusseldorf :
    220 t / 220 pcs.

 

BENELUX

  • Franki Foundation Belgium, Chrystal Computing, Mons:
    1.530 t / 5.322 pcs.
  • Voorbij Funderingstechnieken B.V., Rhinelandroute, Amsterdam:
    350 t / 1.159 pcs.
  • BAM Infra B.V., Royal van Lent, Amsterdam:
    230 t / 1.117 pcs.